• Landscaping beds planted down Burton Farm Road
  • High-Density Stormwater Permit for marina area issued by NCDENR and submitted to CAMA (this is the last large permit CAMA requires before issuing the CAMA major marina permit)
  • Phase 2 street sign logos installed
  • Power-washing of all amenities
  • Telephone poles and wires removed down Burton Farm Road (AP has all underground utilities)
  • Developer and owner homesites underbrushed
  • Riverfront viewing stands and picnic tables installed on homesites 381 and 296
  • Full page newspaper ad campaign
  • AP launched on CarolinaOceanLiving.com